BOM calculation from P & I Diagrams
Instrument Specification Data Sheets
Instrument, JB, Cable Schedule
Loop Schematics / Hook Up drawings
Cable Routing/ Air Line Routing
Installation Drawings
Procurement as per BOM
Timely Delivery at Customer site
Manpower Management
Categorized Documentation
Installation of cable duct / tray, excavation of trenches.
Installation of junction boxes and air distribution boxes.
Installation of instruments with supports.
Impulse piping and tubing. Cable Laying, Glanding & Termination
Installation of control panels, marshalling racks and DCS consoles and related auxiliary activities.
Loop Checking
Calibration of Instruments
Key Items: Pressure / Differential pressure / Level / Temperature transmitters, Local gauges, Receiver instruments, Instrument control panel / desk, marshalling rack, Distributed control system / programmable logic controller, Signal / control / power cable, Cable tray / duct, junction box, cable glands, Erection hardware such as impulse pipe / tube, fittings, valves etc.
Industries Served: Refineries & Petrochemicals, Oil & Gas, Steel, Metal & Mineral, Power, Cement, Sugar, Paper, Chemical, Pharmaceutical & Edible Oil etc